Mezzanine Floor Project for the Framas Hanoi Plastic Raw Material Warehouse

Quick summary: Framas Hanoi Co., Ltd is a manufacturer of engineering plastic components. Its warehouse must hold two very different product groups at the same time: heavy palletised bags of plastic resin pellets, and light but bulky plastic crates of finished goods. Floor space is limited, while the factory still has several metres of unused height. Long Quyen installed a rack-supported mezzanine floor — an intermediate steel floor resting directly on the pallet racking uprights, with no separate support columns. The result: an extra storage level on the second floor, forklifts still running on the ground floor, and high-value goods enclosed by steel mesh with controlled access.

Rack-supported mezzanine vs. mezzanine with separate support columnsRACK-SUPPORTED — used at FramasFREE-STANDING — with its own columnsLight goods on the floorMezzanine deckRacking uprights run continuously from floor to top — no support columns neededSeparate support columns (brown) take up space inside the warehouse
Illustrative diagram: two ways to support a mezzanine deck. The rack-supported option uses the racking uprights themselves as floor columns.

The customer’s challenge before installation

An engineering plastics plant has a feature that consumer-goods warehouses do not: raw materials and finished goods take up space in completely different ways.

Plastic resin pellets come in bags stacked in blocks on pallets and shrink-wrapped: heavy, dense, low volume. Plastic crates and finished components are the opposite — light but bulky, and they cannot be stacked high without crushing. Stored on the same level, the two groups cancel out each other’s advantages: the raw-material area wastes height, and the finished-goods area wastes floor space.

  • Cramped at floor level, unused space overhead. The steel-frame, metal-roof factory had spare height but nothing to use it with.
  • No controlled boundaries. Raw materials, semi-finished goods and consumables were mixed together, and anyone could walk through.
  • No location addressing. Finding a pallet of raw material meant asking around; it could not be looked up by code.
  • No way to expand the building. Building a new warehouse would cost many times more money and time than using the existing height.

The brief to Long Quyen was very specific: increase storage space without touching the factory structure, without pouring new foundations, and with forklifts still able to operate on the ground floor.

Why a mezzanine floor was chosen for the plastic pellet raw-material warehouse

Doubling the area without new foundations

A mezzanine floor — also called an intermediate steel floor — is a steel deck installed between the warehouse floor and the factory roof. Think of it as adding a loft in your home: the land area stays the same, but storage space doubles.

The deciding factor at the Framas site was the structural type: rack-supported mezzanine — the deck rests directly on the pallet racking uprights, with no independent column system. The uprights carry the goods on the lower level and the floor load above at the same time. As a result, there was no need to break the floor to pour separate column footings, the installation time was shorter and structural costs were lower.

Load path of a rack-supported mezzanineLoad path — every weak link compromises the whole chainGoods on the deckSteel floor panelsSecondary beams → main beamsRacking uprights — carry the floor load AND the lower-level goods SIMULTANEOUSLYSteel base plates — spread the pressureConcrete floor — point load capacity must be checkedMost common failure pointUpright bases dented by forklift impact.Once the steel is deformed, the load-bearingcross-section is reduced — and this uprightis also carrying the floor load above.Do not straighten it yourselfCold straightening makes the steel more brittle.Unload that bay, ask thesupplier to inspect and replace the damaged upright.Prevention: column guards.
Illustrative diagram: the load follows a single path down to the floor.

Separating the two product flows by level

Heavy goods below, light goods above. The ground floor is for pallets of plastic resin pellets, with forklifts driving straight in and handling by the pallet. The upper deck is for light goods, handled manually or with trolleys. This arrangement also reduces risk: heavy pallets do not have to be lifted high, so there is no danger of loads falling from a great height.

Goods allocation by level: heavy below, light aboveMEZZANINE LEVEL — light, bulky goodsPlastic crates, finished components, consumables.Manual handling or trolleys — no heavy pallets lifted high.Space-hungry but light goods are moved off the ground floor.The mezzanine deck separates the two levelsGROUND FLOOR — heavy, dense, palletised goodsShrink-wrapped bags of plastic resin pellets on pallets.Clear height under the deck beams must allow forklifts to pass.Location labels on the beams allow goods to be looked up by code.
Illustrative diagram: the level-allocation principle applies to most two-level warehouses.

Demountable and reusable, not a permanent building structure

The entire system is assembled with bolts and pins. When the plant changes its layout or relocates, the floor can be dismantled and reinstalled, recovering almost the full value of the materials. This is the fundamental difference from a poured concrete floor: once concrete is poured it is gone, while a steel floor moves with the business.

If you are weighing different types of pallet racking before considering a mezzanine, read our article comparing selective, drive-in and double-deep racking to choose the right type for the ground floor.

Configuration of the installed mezzanine system

ItemConfiguration
CustomerFramas Hanoi Co., Ltd — manufacturer of engineering plastic components
Structure typeRack-supported mezzanine (deck resting on pallet racking uprights)
Number of usable levels2 levels: ground floor + mezzanine deck
Upright framesRoll-formed steel with continuous perforations, blue powder coating
BeamsBox-section steel, orange powder coating, safety locks at each beam end
Floor beamsSteel beams laid in parallel at uniform horizontal spacing
DeckFlat steel plates fully covering the beam grid
Upright basesSteel base plates fixed with expansion anchor bolts into the concrete floor
PartitionsWelded steel mesh enclosing the storage area under the deck
Access to the deckSteel staircase with handrails
Steel materialHoa Phat / Formosa steel
Design standardsFEM 10.2.02 / EN 15512
Warranty5-year structural steel warranty

Deck area, ground-floor clear height and design loads are calculated individually for each warehouse based on the survey and are included in the design documents handed over with the contract. Do not apply figures from another project to your own warehouse.

Deck construction and safety accessories

Mezzanine deck construction1 · Steel deck panelsFully covering, fixed to the beams2 · Secondary beams — laid perpendicular to shorten spansThe closer the beam spacing, the less the deck deflects3 · Main beams — resting on the tops of the uprightsLong spans, deeper section than the secondary beams4 · Racking uprights support the whole systemSteel base plates fixed with expansion anchor bolts into the floor
Illustrative diagram: the closer the secondary beams, the less the deck deflects under load.

Main beams rest on the tops of the uprights, and secondary beams are laid perpendicular to shorten spans. The closer the beam spacing, the less the deck deflects when loaded. At acceptance, check deck deflection under the design load, bolt torque at beam connections, and upright verticality.

A flat steel-plate deck is easy to clean — important in a plastic pellet warehouse, where spilled pellets easily collect in gaps.

Five safety items that should never be cut

Five safety items of a mezzanine floor1Edge guardrailsRunning along ALL open edges of the deck.A mandatory occupational safety item.2Staircase with handrailsPositioned so that it does not cut across forklift routeson the ground floor.3Beam safety locksPrevent beams from being knocked loose when forkliftforks hit the underside while withdrawing.4Column guardsInstalled at the ends of runs and on both sides of entrances— where forklifts hit most often.5Load signsClearly state the permitted load for each level. Withoutsigns, the warehouse team loads by guesswork.Steel mesh partitions — well worth itEnclose the area under the deck: they define a controlledzone while remaining see-through for monitoring.
Illustrative diagram: items that should not be cut to lower the quoted price.

Every open edge of a mezzanine must have guardrails. With a rack-supported floor, the upright bases transfer both the goods load and the deck load to the floor, so steel base plates enlarge the contact area to spread the pressure, and expansion anchor bolts secure the uprights against lateral movement in a forklift impact.

Mesh partitions do two jobs at once: they control access and still allow visibility — the warehouse manager can see all the goods inside from outside, unlike solid walls or metal sheeting. For a plastics plant, where raw materials are the largest input cost, this is an inexpensive control measure.

Installation process in an operating factory

The difficulty with this type of project is that the factory is still in production. Goods are already in the warehouse, so the installation team must work zone by zone without stopping production.

  1. Survey and setting out. Measure the floor, check levels, and mark upright positions according to the layout drawing.
  2. Erect the upright frames and ground-floor beams. Install frames run by run, fix the base plates with expansion bolts, and plumb them with a plumb line and spirit level.
  3. Install the floor beam system. Place main beams on the tops of the uprights, lay secondary beams to divide the spans, and tighten bolts to the specified torque.
  4. Lay the deck panels. Lift the steel panels up, fit them tightly and fix them to the beams.
  5. Install guardrails, staircase and mesh partitions. Complete all safety items before loading goods onto the deck.
  6. Acceptance and handover. Check deflection, upright verticality and bolt torque; apply location labels; hand over the documentation.

Photos of the Framas Hanoi mezzanine floor project

An album of 9 photos taken on site: the rack-supported mezzanine viewed from the ground floor, the second-level deck, the underside with orange steel beams, the steel staircase, safety mesh guardrails and the pallet racking area holding bags of plastic resin pellets. Click each photo to view it at full size.

Results after handover

  • An extra storage level on exactly the same floor area, without expanding the factory.
  • The ground floor operates forklifts as usual. The clear height under the deck beams was calculated so forklifts can pass and lift pallets to the top beam level.
  • Raw materials are zoned. Steel mesh partitions create a controlled-access boundary for the high-value goods area.
  • Goods have addresses. Location labels on the beams allow goods to be found by code instead of by memory.
  • A recoverable asset. The system is bolted together and can be relocated with the factory when needed.

How to calculate pallet capacity — a formula for your own estimate

Many customers ask, “How many pallets can my warehouse hold?” The answer lies not in floor area but in four numbers multiplied together:

Number of pallets = (number of racking runs) × (bays per run) × (pallets per bay) × (beam levels)

Illustrative example with standard 1,100 × 1,100 mm pallets: a 2,700 mm beam bay holds 2 pallets side by side. If the warehouse has 8 runs, 10 bays per run, 2 pallets per bay and 4 beam levels, the total is 8 × 10 × 2 × 4 = 640 pallet positions. Add a mezzanine above that area and you gain another level for storing light goods.

The real figure also depends on forklift aisle width, the forklift’s lift height and the permitted floor load. That is why Long Quyen provides a free 3D layout design before quoting — so you see the figures for your own warehouse, not example figures.

Frequently asked questions

Does a mezzanine floor need a building permit?

A mezzanine floor is a demountable, bolted structure installed inside an existing factory building, without changing its load-bearing structure. Companies normally do not need a building permit for it. Specific rules depend on each locality and industrial park — confirm with the park management board before going ahead.

Can my warehouse floor support a mezzanine?

This question must be answered with numbers. You need to know the slab thickness and concrete grade, the permitted load, and the load transferred to each upright base. During the survey, Long Quyen engineers calculate the base loads and compare them with the floor’s capacity. If the floor is weak, the base plates are enlarged to spread the pressure, or the upright spacing is adjusted.

Why choose a rack-supported floor instead of one with separate columns?

Two reasons. Savings: the racking uprights double as floor columns. Space use: the area under the deck immediately becomes storage. In return, this option requires stricter load calculation, because the uprights carry both the goods load and the floor load.

What special considerations apply to a plastic pellet warehouse?

Bags of plastic pellets create concentrated loads, so the actual pallet weight must be declared correctly at the design stage — not estimated. Plastic pellets absorb moisture, so they need ventilation and should not be placed against damp walls. A flat steel-plate deck is easy to clean and stops spilled pellets collecting in gaps.

What should I do if a forklift dents a racking upright?

Do not straighten it yourself — deformed steel has reduced load capacity, and cold straightening makes the material more brittle. The correct approach: notify the supplier for inspection, unload that bay, and replace the upright frame or damaged section. The cheapest prevention is fitting column guards at the ends of runs and on both sides of entrances.

How long does it take to install a mezzanine floor?

It depends on the area, complexity and whether the warehouse must keep operating during installation. Long Quyen fixes a specific schedule after the survey and states it in the contract by milestone: delivery, frame erection, decking, safety completion and acceptance.

Why choose Long Quyen

  • Nearly 30 years specialising in industrial warehouse racking, since 1997.
  • 500+ projects delivered.
  • 100% in-house manufacturing at our own factory — quality controlled from steel coil to finished product.
  • Designed to FEM 10.2.02 / EN 15512, quality management system ISO 9001:2015.
  • Hoa Phat / Formosa steel, powder coating, 5-year structural steel warranty.
  • Free 3D layout design before quoting.

How many metres of height in your warehouse are still unused?

Send us your warehouse dimensions and we will build a 3D layout and calculate the number of pallet positions free of charge.
Long Quyen Manufacturing & Trading Co., Ltd. — Hotline 0903 422 179 (Mr. Dat) · contact@giakelongquyen.com · Office: 79 Dao Tan, Giang Vo Ward, Hanoi