{"id":174496,"date":"2026-08-19T20:36:09","date_gmt":"2026-08-19T13:36:09","guid":{"rendered":"https:\/\/giakelongquyen.com\/honda-spare-parts-warehouse-mezzanine-project-two-level-multi-tier-racking\/"},"modified":"2026-08-19T20:36:09","modified_gmt":"2026-08-19T13:36:09","slug":"honda-spare-parts-warehouse-mezzanine-project-two-level-multi-tier-racking","status":"publish","type":"post","link":"https:\/\/giakelongquyen.com\/en\/honda-spare-parts-warehouse-mezzanine-project-two-level-multi-tier-racking\/","title":{"rendered":"Honda Spare Parts Warehouse Mezzanine Project \u2013 Two-Level Multi-Tier Racking"},"content":{"rendered":"<p><strong>In 2013, Long Quyen built a mezzanine floor combined with multi-tier racking for the spare parts warehouse of the Honda factory \u2013 one of the largest steel-structure projects we have ever delivered, and one of the most demanding in terms of safety standards.<\/strong><\/p>\n<h2>Project background<\/h2>\n<p>The spare parts warehouse had to hold tens of thousands of small component SKUs on limited floor space, while plenty of building height remained unused. The client required double the usable area, absolutely safe working aisles and an installation schedule that would not disrupt production.<\/p>\n<h2>Long Quyen&#8217;s solution<\/h2>\n<p>Long Quyen designed a two-level steel-structure mezzanine on its own load-bearing columns, with rows of multi-tier component racking arranged below and above. The deck uses anti-slip checker plate, the steel stairs have handrails, and all connections use high-strength bolts, calculated to current steel-structure standards.<\/p>\n<h2>Photos from the installation<\/h2>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/giakelongquyen.com\/wp-content\/uploads\/2026\/08\/du-an-san-mezzanine-kho-phu-tung-honda-1.jpg\" alt=\"Overview of the two-level mezzanine built by Long Quyen at the Honda spare parts warehouse\" loading=\"lazy\" title=\"\"><figcaption><\/figcaption><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/giakelongquyen.com\/wp-content\/uploads\/2026\/08\/du-an-san-mezzanine-kho-phu-tung-honda-2.jpg\" alt=\"Rows of multi-tier component racking under the mezzanine at the Honda warehouse\" loading=\"lazy\" title=\"\"><figcaption><\/figcaption><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/giakelongquyen.com\/wp-content\/uploads\/2026\/08\/du-an-san-mezzanine-kho-phu-tung-honda-3.jpg\" alt=\"Aisle between racking rows with steel grating deck on the Honda warehouse mezzanine\" loading=\"lazy\" title=\"\"><figcaption><\/figcaption><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/giakelongquyen.com\/wp-content\/uploads\/2026\/08\/du-an-san-mezzanine-kho-phu-tung-honda-4.jpg\" alt=\"Multi-tier racking with orange beams installed on the mezzanine of the Honda spare parts warehouse\" loading=\"lazy\" title=\"\"><figcaption><\/figcaption><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/giakelongquyen.com\/wp-content\/uploads\/2026\/08\/du-an-san-mezzanine-kho-phu-tung-honda-5.jpg\" alt=\"Steel staircase leading up to the mezzanine at the Honda warehouse\" loading=\"lazy\" title=\"\"><figcaption><\/figcaption><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/giakelongquyen.com\/wp-content\/uploads\/2026\/08\/du-an-san-mezzanine-kho-phu-tung-honda-6.jpg\" alt=\"Load-bearing steel column frame of the Honda warehouse mezzanine\" loading=\"lazy\" title=\"\"><figcaption><\/figcaption><\/figure>\n<h2>Handover results<\/h2>\n<p>Storage area nearly doubled on the same footprint, and manual picking runs safely on both levels. The mezzanine has operated reliably for more than a decade and has served as a reference project for many of Long Quyen&#8217;s later FDI factory clients.<\/p>\n<p>Learn more about related products: <a href=\"https:\/\/giakelongquyen.com\/en\/mezzanine-floors-double-your-area-without-building-long-quyen\/\">Mezzanine Floor Racking<\/a> \u00b7 <a href=\"https:\/\/giakelongquyen.com\/en\/multi-tier-racking-2-3-tiers-with-walkways-2-3x-the-floor-area-long-quyen\/\">Multi-Tier Racking<\/a> \u00b7 <a href=\"https:\/\/giakelongquyen.com\/en\/rack-supported-floors-working-floors-carried-by-the-racking-long-quyen\/\">Rack-Supported Mezzanine<\/a> \u2014 or explore all <a href=\"https:\/\/giakelongquyen.com\/en\/warehouse-solutions-32-racking-ranges-mezzanines-and-automation-long-quyen\/\">warehouse solutions<\/a> from Long Quyen. Call <a href=\"tel:0903422179\">0903 422 179<\/a> for a free site survey.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In 2013, Long Quyen built a mezzanine floor combined with multi-tier racking for the spare parts warehouse of the Honda[&#8230;]<\/p>\n","protected":false},"author":6,"featured_media":162094,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11445],"tags":[],"class_list":["post-174496","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-reference-project"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/giakelongquyen.com\/wp-content\/uploads\/2026\/08\/du-an-san-mezzanine-kho-phu-tung-honda-1.jpg","_links":{"self":[{"href":"https:\/\/giakelongquyen.com\/en\/wp-json\/wp\/v2\/posts\/174496","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/giakelongquyen.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/giakelongquyen.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/giakelongquyen.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/giakelongquyen.com\/en\/wp-json\/wp\/v2\/comments?post=174496"}],"version-history":[{"count":0,"href":"https:\/\/giakelongquyen.com\/en\/wp-json\/wp\/v2\/posts\/174496\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/giakelongquyen.com\/en\/wp-json\/wp\/v2\/media\/162094"}],"wp:attachment":[{"href":"https:\/\/giakelongquyen.com\/en\/wp-json\/wp\/v2\/media?parent=174496"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/giakelongquyen.com\/en\/wp-json\/wp\/v2\/categories?post=174496"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/giakelongquyen.com\/en\/wp-json\/wp\/v2\/tags?post=174496"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}