Mezzanine Floors – Double Your Area Without Building More
Add one or two steel levels inside your existing building. Use the height that is going to waste and double your usable area for a fraction of the cost of building new.
Why Choose a Mezzanine Floor?
A building 8–10 m tall but only the bottom 3 m in use — the rest is money going to waste.
Double the area
On the same footprint, one extra level doubles the usable area with no need to rent or build another warehouse.
Many times cheaper than building new
The cost per square metre is far lower than a new building, and there is no waiting for construction permits.
Dismantled and relocated
A bolted structure with no fixed welding — when you move warehouse it can be taken apart and rebuilt on the new site.
Suits many purposes
Storage, production areas, offices, changing rooms or staff rest areas all work.
Mezzanine Floor Specifications
Long Quyen calculates each floor individually to the service load and the condition of the building’s floor slab.
| Deck load | 300 – 1,000 kg/m² (depending on the intended use) |
| Level height | 2,500 – 4,500 mm |
| Column span | 3,000 – 6,000 mm |
| Upright | H-section or box section steel, 4 – 10 mm thick |
| Main / secondary beams | I- or H-section steel, calculated for the span and load |
| Decking | Steel deck sheet with concrete topping, anti-slip plate, film-faced plywood or steel mesh |
| Staircase | 900 – 1,200 mm wide, anti-slip treads, handrails both sides |
| Safety | Three-rail handrails, kick plates, pallet safety gate |
| Surface | Two coats of anti-rust primer plus a coloured topcoat |
| Warranty | 5 years on the steel structure |
Mezzanine Floor Structure
Six main assemblies, all connected with high-strength bolts so the whole floor can be dismantled.
Columns and base plates
Section steel columns on thick base plates, fixed with chemical anchors into the concrete slab — this is the point that decides safety.
Main beams
Connect the column heads, carry the main load and transfer it to the columns. The section is calculated for the span and the design load.
Secondary beams (purlins)
Sit on the main beams at 800–1,200 mm centres, directly supporting the deck.
Decking
Steel deck with concrete topping for heavy loads and fire resistance; anti-slip plate or film-faced board when fast, lightweight installation is needed.
Staircase
Straight or L-shaped with a landing, anti-slip treads and handrails both sides to safety standards.
Handrails and pallet gate
Three-rail handrails around the whole floor edge; a rotating pallet gate lets goods be lifted up without ever leaving the edge open.
Photos of Long Quyen Mezzanine Floors
Mezzanine floor projects designed, manufactured and built by Long Quyen.
Further reading on steel structures on Wikipedia or see all of Long Quyen’s warehouse racking solutions.
Why Choose Long Quyen?
A factory with nearly 30 years
Manufactured directly at our Xuan Phuong factory in Hanoi — no middlemen, factory-gate pricing.
Free 3D layout design
We survey your warehouse, build the 3D drawing and calculate loads free of charge before quoting.
Nationwide installation
A professional installation team, on schedule, nationwide across Vietnam.
European standards
High-grade steel, powder coating and load testing to FEM/SEMA standards.
Long-term warranty
Product warranty, scheduled maintenance and fast supply of replacement parts.
Trusted by 500+ businesses
Partner to Vietnam’s leading logistics, manufacturing and distribution companies.
Project Delivery Process
Contact
We take your brief and give initial advice
Survey
Free on-site measurement of your warehouse
Design
3D layout drawing + quotation
Production
Fabrication at our Hanoi factory
Installation
Installation and load acceptance testing
Warranty
Long-term scheduled maintenance
Featured Long Quyen Mezzanine Floor Projects Delivered
Real warehouses, real customers. Click any project to see site photos, rack configuration and how Long Quyen solved the floor-space problem.
ISO 9001:2015 certified
The quality management system of Long Quyen Production and Trading Co., Ltd. has been assessed by ISOCERT and certified to ISO 9001:2015 for the manufacture of storage racking and industrial shelving (warehouse racking, iron and steel).
| Certificate No. | 9199293405100-QMS |
|---|---|
| Certification body | ISOCERT (VICAS 067-QMS, IAF) |
| Valid | 02 Dec 2025 – 01 Dec 2028 |
| Sites | Head office 79 Dao Tan St., Giang Vo Ward; factory 1085 Phuc Dien St., Xuan Phuong Ward, Hanoi |
FAQ – Mezzanine Floors
What load can a mezzanine floor carry?
What does the building floor need to meet?
Is a construction permit needed?
Which decking should I choose?
How long does installation take, and does production have to stop?
Can it be taken along if we move warehouse later?
Optimise Your Warehouse – More Capacity, Lower Cost
Contact us now for a free survey and 3D layout design.
Request a Mezzanine Floor Quote
Fill in the form and Long Quyen will reply within 30 minutes (business hours).