Mold Racking and Storage Racks Installed at Dong A Company

Mold Racking at Dong A Company – Heavy Mold Storage, Fast Retrieval

A roll-out drawer mold rack project designed, manufactured and installed by Long Quyen for Dong A Company: plastic injection molds and metal stamping dies are sorted by level and pulled out for lifting by crane or forklift in just a few minutes.

5,000 kgMaximum load per drawer
3 minutesTime to retrieve one mold set
30+Years of Long Quyen experience
Project overview

Dong A Mold Racking Project Overview

Long Quyen surveyed the existing mold store, calculated the actual weight of each mold set, then designed a drawer rack system to suit the factory’s ceiling height and the customer’s existing lifting equipment.

🏭

Customer

Dong A Company – a mechanical engineering and plastic injection business whose mold inventory grows quickly with production.

📦

Scope

Roll-out drawer mold racks, combined with heavy-duty racking for accompanying materials.

⚙️

Requirements

Store molds from a few hundred kilograms to several tonnes, handled safely with overhead cranes and forklifts.

🧰

Long Quyen’s role

Turnkey survey, design, in-house fabrication, transport, installation and handover.

The customer’s problem

The Mold Storage Problem Before the Racks

Molds are high-value assets, yet they are often stacked on the factory floor, causing a string of production problems.

📉

Wasted floor space

Molds stacked in blocks encroached on aisles and operator work areas.

⏳

Time lost finding molds

To reach a mold at the bottom, every mold above had to be lifted off – each changeover took hours.

⚠️

Safety risks

Stacks weighing several tonnes could slip and topple during lifting, directly endangering operators.

🛠️

Mold deterioration

Impacts, floor moisture and dust caused rust, shortening mold life and reducing product quality.

Technical specifications

Technical Specifications of the Installed Mold Racks

Standard specifications of Long Quyen mold racks – every dimension is adjusted to each plant’s actual mold sets.

Load per drawer 500 – 5,000 kg depending on design
Standard drawer load Over 1,000 kg per drawer
Levels 2 – 5 levels, adjustable in 50 – 75 mm steps
Drawer type Assisted roll-out drawers, 80 – 100% extension
Material Box-section steel and thick steel plate, anti-rust powder coating
Mold retrieval Overhead crane, hoist or standard-fork forklift
Safety Rail locking pins, load signs on every level
Installation Anchored to the concrete floor with expansion bolts, laser-levelled

Loads and structure are calculated according to international practice for pallet racking systems.

Long Quyen’s solution

Long Quyen’s Solution

Instead of selling off-the-shelf racks, Long Quyen custom-designed the system around Dong A’s mold sizes and weights to make full use of the factory height.

📐

Designed around the molds

Each mold group was measured and weighed, then levels and bays were sized to match.

🛤️

Assisted roll-out drawers

Load-bearing rails let the drawer slide out easily so the mold can be lifted from above by crane.

🏗️

Modular structure

The modular steel frame allows extra bays to be added as the number of molds grows.

🛡️

5S safety standard

Numbered bays, load signs and anti-rust powder coating following ISO – 5S procedures.

Results

Results After the Racks Went Into Operation

After handover, Dong A’s mold storage area changed dramatically in both space and handling speed.

📐

Far more compact

Molds are stored upward by level, freeing floor space for production.

⚡

Faster mold changes

Finding and retrieving a mold set now takes just a few minutes.

🦺

Safe operation

No more lifting off stacks of molds – the risk of workplace accidents is greatly reduced.

💎

Protecting mold assets

Molds no longer sit on damp floors, limiting rust and impact damage and extending their life.

Project photos

Photos of the Mold Racks at Dong A

Photos of the mold racking system manufactured and installed by Long Quyen at Dong A Company’s plant.

Long Quyen mold racking system installed at Dong A Company's plant Roll-out drawer of the mold rack fully extended for mold retrieval Powder-coated box-section steel structure of the heavy-duty mold rack Plastic injection molds sorted on each level of the mold rack Overview of the mold storage area after installing Long Quyen racks
About us

Why Choose Long Quyen?

A factory with nearly 30 years

We manufacture directly at our Xuan Phuong factory in Hanoi – no middlemen, factory-direct prices.

Free 3D layout design

Warehouse survey, 3D drawings and load calculations free of charge before quoting.

Nationwide installation

A professional installation team delivering on schedule throughout Vietnam.

European standards

High-quality steel, powder coating and load testing to FEM/SEMA standards.

Long-term warranty

24–60 month warranty (depending on rack type and accessories), scheduled maintenance and fast replacement parts.

Trusted by 500+ businesses

Partner to leading logistics, manufacturing and distribution companies in Vietnam.

GET FREE ADVICE →

Process

Project Delivery Process

1

Contact

Needs assessment and initial advice

2

Survey

Free on-site warehouse measurement

3

Design

3D layout drawing + quotation

4

Manufacturing

Fabrication at our Hanoi factory

5

Installation

Installation, load acceptance testing

6

Warranty

Long-term scheduled maintenance

FAQ

Frequently Asked Questions About Mold Racks

How much load can a mold rack carry?
Long Quyen’s standard range carries 500 kg to 5,000 kg per drawer. For extra-heavy molds, the structure is calculated individually based on actual weight.
How are molds taken out of the rack?
The roll-out drawer extends 80 – 100% of its depth, then an overhead crane, hoist or forklift lifts the mold from above – no need to move other molds.
Can the racks be expanded later?
Yes. The modular structure allows extra bays or levels to be added as the plant’s mold inventory grows.
How long do manufacturing and installation take?
Depending on volume, typically 7 – 20 days after the drawings are approved. Long Quyen installs outside working hours to avoid disrupting production.
Does Long Quyen carry out on-site surveys?
Yes. Our engineers visit the warehouse to measure, weigh the molds and advise on a solution free of charge before quoting.

Optimize Your Warehouse – Boost Efficiency – Cut Costs

Contact us now for a free survey and 3D layout design.

CALL NOW: 0903 422 179

Quick quote

Request a Quote for Mold Racks

Fill in your details and Long Quyen will reply within 30 minutes (business hours).