Multi-purpose Iron Mezzanine Assembled at SHC Company Warehouse

In the context of increasing space costs, optimizing warehouse space becomes an urgent requirement for every business. Multi-purpose iron mezzanine is not only a solution to expand the area, but also a breakthrough in optimizing the modern warehouse operation process.

Outstanding features of the multi-purpose iron mezzanine system

1. Advanced design

  • Flexible modular structure, easy to disassemble
  • High load capacity, from 300-800 kg/m²
  • Independent load-bearing column system
  • Seamless integration with existing shelving systems

2. Outstanding features

  • Double or triple the usable area
  • Optimize warehouse height up to 12m
  • Portability and re-installation
  • Diverse floor materials: steel panels, industrial wood, steel mesh

Practical application

1. Industrial warehouse

  • Optimize storage space
  • Conveyor system integration
  • Packing and sorting area

2. Showroom and store

  • Create multi-level display space
  • Executive office area
  • Optimize sales area

3. Manufacturing plant

  • Scientific production line layout
  • Raw material storage area
  • Workspace for employees

Implementation process

  1. Survey and consultation
    • Assess actual needs
    • Analyze existing structures
    • Propose suitable solutions
  2. Design and simulation
    • Professional 3D design
    • Detailed load calculation
    • Optimize layout
  3. Production and installation
    • Production process according to ISO standards
    • Professional installation team
    • Comprehensive quality monitoring

Economic benefits

  1. Cost savings
    • 50% reduction in premises costs
    • Optimize operating personnel
    • Fast ROI in 12-18 months
  2. Increase performance
    • Improve work productivity
    • Optimize logistics processes
    • Efficient inventory management

Maintenance and safety

Safety standards

  • ISO 9001:2015 compliant
  • Industrial safety certification
  • Standard railing and staircase system

Maintenance mode

  • Check every 6 months
  • 24 month comprehensive warranty
  • 24/7 Technical Support

FAQs

1. How long does it take to install a mezzanine system? Typically, a 500m² mezzanine system will take about 7-10 days to complete installation.

2. What is the maximum load of the mezzanine? Depending on the design, the load can be from 300-800 kg/m², meeting most storage needs.

3. Can the system be moved to another location? Yes, the modular design allows for easy disassembly and reinstallation at a new location.

4. What is the average investment cost? Cost depends on area and specific requirements, usually ranging from 0.5-1.5 million VND/m².

5. Expected payback period? With space and operations optimization, ROI is typically achieved within 12-18 months.

Multi-purpose iron mezzanine is the optimal solution for businesses that want to maximize warehouse space. With 25 years of experience in the industry, Long Quyen Shelf is proud to bring the most comprehensive, quality and effective solutions for your business.

The multi-purpose prefabricated steel mezzanine has independent vertical columns, providing a cost-effective and practical way to maximize the usable height of the warehouse. Mezzanine floors are loaded per square meter and are designed and manufactured to your specifications.

iron mezzanine for loft floor

A multi-level mezzanine functions as a multi-level system supporting the steel truss system. It is a perfect solution to utilize the entire space of the warehouse block.

3 storey mezzanine house iron mezzanine

The mezzanine floor is also equipped with multi-level staircases and a loading area with pallet gates to distribute products into the racking system. Elevators, conveyors and chutes can also be installed for easier replenishment, retrieval and dispatch.

3 story mezzanine floor

Freestanding steel warehouse mezzanine floors provide a cost effective and practical means of maximising the usable height of a warehouse.

iron shelf floor iron mezzanine floor

[woowgallery id=”115595″]

HOT LINE:
0903422179 (Mr. Dat)
0903412296 (Mr. Hien)
0903434374 (Mr. Cam)
EMAILS:
contact@giakelongquyen.com
contact@longquyen.com
OFFICE: 79 Dao Tan St., Giang Vo Ward, Ha Noi, Viet Nam
84-24-37260098; Fax: 84-24-32115955
FACTORY: 1085 Phuc Dien St., Xuan Phuong Ward, Ha Noi, Vietnam
84-24-37643527; Fax: 84-24-37643767

[wpforms id=”119062″]