1. Project Overview
1.1. Customer Information
Vina TC Company is an enterprise operating in the field of production and trade. With the need to expand warehouse space to meet production growth, the company chose Long Quyen’s mezzanine floor racking solution.
1.2. Project Objective
The project aims to maximize existing warehouse space, creating additional usable area without expanding the premises. Requirements include flexible load-bearing capacity, convenience in moving goods, and ensuring absolute safety during operation.
2. Technical Solutions
2.1. System Design
The mezzanine floor racking system is designed according to international industrial standards with the following features:
- High-grade steel structure
- Anti-slip flooring system
- Standard Access Stairs
- Safety railings all around
- Integrated lighting system
2.2. Specifications
- Design load: 500 kg/m²
- Floor height: 3.5m
- Mezzanine floor area: 450m²
- Material: Hot dip galvanized steel
- Floor surface: Anti-slip profiled steel plate
3. Implementation Process
3.1. Project Progress
The project was carried out in 3 weeks with the following stages:
- Survey and design: 5 days
- Production and preparation: 10 days
- Installation and completion: 6 days
3.2. Construction and Safety
The installation process strictly follows labor safety procedures, with a team of professional technicians and modern equipment. Construction work is arranged reasonably so as not to affect the company’s production activities.
4. Results Achieved
4.1. Effective Use
- Increase usable area by 90%
- Optimize storage and transportation processes
- Reduce warehouse operating costs by 40%
- Improve employee productivity
4.2. Customer Feedback
Vina TC Company expressed satisfaction with the quality of construction and professional services of Long Quyen. Particularly appreciate the aesthetics and safety of the system.
FAQs – Frequently Asked Questions
Customers are often concerned about several key issues when implementing a mezzanine floor shelving project. Below are details to answer common questions:
About Implementation Time
The average construction time for a mezzanine floor shelf project at Vina TC lasts from 2-4 weeks. The specific time depends on the scale and specific requirements of the project. Long Quyen commits to comply with the agreed schedule and can adjust the construction plan to suit the customer’s operating schedule.
About Load Capacity
The mezzanine floor shelf system is designed with a load capacity of 300-1000 kg/m2. For the project at Vina TC, we have calculated and designed a system with a load capacity of 500 kg/m2, fully meeting the storage and operation requirements of the business.
About Legal Procedures
The installation of mezzanine shelves is classified as industrial interior equipment and does not require a building permit. However, Long Quyen ensures full compliance with technical and safety standards during the design and construction process.
About Warranty Policy
Long Quyen provides a comprehensive 5-year warranty for the main structure and 2 years for auxiliary components. During the warranty period, we are committed to promptly handling any problems that arise, ensuring the system operates stably and effectively.
About Maintenance Service
To ensure the system operates safely and efficiently, Long Quyen provides periodic maintenance service every 6 months. The technical team will perform comprehensive inspection, maintenance and recommend optimal solutions when necessary.
Contact Information
For detailed advice on mezzanine shelving solutions for businesses, please contact:
Hotline
- Mr. Dat: 0903422179
- Mr. Hien: 0903412296
- Mr. Cam: 0903434374
Contact Email
Head Office
79 Dao Tan, Hanoi Phone: 84-24-37260098 Fax: 84-24-32115955
Manufacturing Plant
1085 Phuc Dien St., Xuan Phuong Ward, Hanoi Phone: 84-24-37643527 Fax: 84-24-37643767
[wpforms id=”119062″]
Long Quyen is committed to providing optimal solutions for your business’s warehouse space. Please contact us now for detailed advice and best quote.